Closeboard
Closeboard along a side path
A leaning panel fence replaced with closeboard and a matching side gate.

The job
The old panels had been patched repeatedly and the posts were loose. The path is narrow, so everything had to be carried through by hand.
What we did
Old posts and footings were dug out, new posts concreted in and the fence built in place with gravel boards. The side gate was made to the width of the opening and hung on a deeper post.
Photographs
(view larger)The finished run and gate
(view larger)Featheredge boards
No photographs in this group yet.
Ready for a straight quote?
Free site visit. Written, itemised price. No obligation.